Project profile

NEXTDC S7 Data Centre, Eastern Creek

NEXTDC S7 is a proposed hyperscale and AI data centre campus at Eastern Creek in Western Sydney, about 45 km west of the Sydney CBD. NEXTDC is the developer. The NSW planning application (SSD-113934740) describes a 612 MW facility of three two-storey data storage buildings, with an on-site substation and 340 backup diesel generators. NEXTDC describes the campus as 650 MW. The project is at the Prepare EIS stage and has not been approved. In December 2025, NEXTDC and OpenAI signed a non-binding memorandum of understanding for OpenAI to use capacity at S7 for an AI campus and GPU supercluster. The first phase is targeted for the second half of 2027, subject to approvals.


Project facts

FieldInformation
ProjectNEXTDC S7 Data Centre, Eastern Creek
DeveloperNEXTDC
OperatorNEXTDC
LocationEastern Creek, NSW (Blacktown City Council area)
Site area25.5 ha (255,135 m²)
Capacity612 MW operational capacity (planning application); 650 MW (NEXTDC and OpenAI announcement)
Investment~A$7 billion for the OpenAI MoU campus (reported); site acquired for A$353 million
StatusPrepare EIS
ApplicationState Significant Development, SSD-113934740
Anticipated customerOpenAI (non-binding MoU, December 2025)
Construction startNot publicly disclosed
Expected completionFirst phase targeted H2 2027, subject to approvals (NEXTDC/OpenAI)
Last verified27 September 2026

Project Overview

S7 is NEXTDC's largest planned Australian campus and one of the largest proposed in Western Sydney. The NSW Planning Portal describes it as the "construction and operation of a data centre with an operational capacity of 612 MW comprising of three, two-storey data storage buildings including 340 back-up diesel generators, diesel fuel storage, on-site substation, site works and car parking."

The December 2025 MoU with OpenAI, under OpenAI's "OpenAI for Australia" programme, positions S7 as a sovereign AI campus. The announcement named government, financial services, defence, research and enterprise as target customers.


Location

S7 is at Eastern Creek, in Blacktown City, about 45 km west of the Sydney CBD. NEXTDC notes the site is about 8 km from its S4 site at Horsley Park. Eastern Creek is one of Western Sydney's established data centre precincts. CDC's Eastern Creek campus is operating nearby, and Goodman's Project Atlas (SSD-101067971) is proposed at 10 Roberts Road.

More: Western Sydney data centres


Proposed Capacity

SourceFigureBasis
NSW Planning Portal (SSD-113934740)612 MW"Operational capacity" in the project description
NEXTDC / OpenAI announcement (Dec 2025)650 MWCampus capacity as announced
Earlier media reports550 MW+Earlier figures reported before the application

The differences may reflect different capacity measures or design changes between announcements. The planning application figure is the one that will be assessed.


Power Infrastructure

The application includes an on-site substation. S7 is in the part of the Sydney basin where Transgrid reports more than 10 GW of data centre connection enquiries within 12 km of its Sydney West substation. Transgrid's Network Capacity Allocation Policy (from 14 August 2026) allocates capacity only at signed connection agreements, with conditions on project progress.

Grid connection agreement status: Not publicly disclosed.


Cooling Infrastructure

The OpenAI MoU announcement describes "closed-loop, high-density liquid cooling systems designed to support ultra-dense GPU deployments without relying on potable water" (w.media). Detailed cooling specifications will be in the EIS.


Backup Generation

340 backup diesel generators and diesel fuel storage (planning application). Generator testing regimes, air quality and noise will be assessed through the EIS.


Planning & Approvals

StageStatus
SEARsIssued
Prepare EISCurrent stage
ExhibitionPending
Collate submissionsPending
Response to submissionsPending
AssessmentPending
RecommendationPending
DeterminationPending

Consent authority: NSW Minister for Planning or delegate (State Significant Development). Projects meeting the NSW Data Centre Policy Framework's performance measures (August 2026) receive a commitment to assessment within 75 days.


Construction

Construction has not started. Head contractor: Not publicly disclosed.


Companies Involved

CompanyRoleStatusSource
NEXTDCDeveloper, owner, operatorConfirmedNSW Planning Portal; NEXTDC
OpenAIAnticipated anchor customerNon-binding MoU (5 Dec 2025)w.media; NEXTDC ASX release
Blacktown City CouncilLocal councilPlanning areaNSW Planning Portal
Head contractorNot publicly disclosed
Engineering consultantsNot publicly disclosed

Supplier Requirements

Likely infrastructure categories based on published project specifications:

This list does not mean contracts are available. Procurement decisions rest with NEXTDC and its appointed contractors.


Project Timeline

September 2026. Project remains at Prepare EIS on the NSW Planning Portal (checked 27 Sep 2026).

14 August 2026. Transgrid's Network Capacity Allocation Policy takes effect for large loads, including Sydney basin data centres.

5 December 2025. NEXTDC and OpenAI announce a non-binding MoU for a ~A$7 billion AI campus at S7, with the first phase targeted for H2 2027, subject to approvals.

October 2024. NEXTDC acquires the 25.5 ha Eastern Creek site for A$353 million (ARN).


Latest Updates

No change in planning stage since the last check. The next expected milestone is public exhibition of the EIS.


  • NEXTDC S4, Horsley Park: NEXTDC, about 8 km away
  • Goodman Project Atlas, Eastern Creek: same precinct
  • Mamre Road Data Centre Campus, Kemps Creek
  • NEXTDC M4, Port Melbourne: NEXTDC's approved AI-ready campus

Operator: NEXTDC profile · City: Western Sydney · Theme: AI data centres in Australia


Sources & Verification

NSW Planning Portal NEXTDC S7 Data Centre, Eastern Creek SSD-113934740. Stage: Prepare EIS. Checked 27 September 2026. planningportal.nsw.gov.au

NEXTDC (ASX announcement) Building the Next Generation of Sovereign AI Infrastructure, 5 December 2025 ASX release

w.media OpenAI and NextDC unveil AUD 7bn plan for sovereign AI campus in Sydney, December 2025 w.media

DCD NextDC S7 Australian data center to offer 612MW of capacity datacenterdynamics.com

ARN NextDC spends $353M on new Eastern Creek site, October 2024 arnnet.com.au

Transgrid Data centres and electricity capacity in NSW transgrid.com.au


See something that needs updating? Submit a correction. NEXTDC and project consultants can submit corrections with a source.


Tracking Western Sydney projects like S7?

AISB's Opportunity Radar follows projects like S7 from planning to procurement and flags the stage changes that matter for your supplier category.

Trusted by ambitious businesses
Coolaroo client logo
MSP client logo
NSK client logo
ECI client logo
Just Junk client logo
Equalexes client logo
Property With Superannuation client logo
A Plus Cosmetic Clinic client logo
Baran de Bordeaux client logo
Joint's Up client logo
Pacific Fuel Solutions client logo
Shafer Design Limited client logo
Dr M Janjic client logo
Elisha Engineering client logo
Extreme Global client logo
GF Flow System client logo
Humphries client logo
Frontier Pools client logo
Katarzyna Mackenzie Plastic Surgeon client logo
Yeomans Survey Solutions client logo
Marina Specialists client logo
The Oral Care Company client logo
Operation Restore Hope client logo
Patara Life client logo
Dr Tristan de Chalain client logo
Mo Cullen Shirtsmith client logo