Data centre projects by city

Sydney Data Centres & Development Pipeline

Sydney is Australia's largest data centre market by operational capacity, pipeline and number of operators. Venture Insights puts Sydney's share of national deployable capacity at 58%. DC Byte estimates about 0.8 GW of operational capacity in 2025 and forecasts 2.0 GW by 2030.

This page covers the whole metro market: inner-city and northern facilities, operators, power, policy and connectivity. The Western Sydney precincts where most new hyperscale capacity is being planned (Eastern Creek, Kemps Creek, Horsley Park, Marsden Park) have their own page: Western Sydney data centres.


Sydney Data Centre Market

MeasureFigureSource
Operational capacity, 2025~0.8 GWDC Byte
Forecast operational capacity, 2030~2.0 GWDC Byte
Sydney pipeline (all stages)11.4 GWDC Byte: 8.6 GW early stage, 1.9 GW committed, 0.1 GW under construction
Share of national deployable capacity58%Venture Insights, Mar 2026
NSW share of NEM data centre electricity use~66%AEMO 2026 ESOO
NSW data centres in the SSD pipeline19 projects, $50.3 billionNSW Government, Aug 2026

Why is Sydney Australia's largest data centre market?

Sydney has the largest concentration of enterprise, financial services and government customers. It is the primary Australian region for every major cloud provider, and it is where most international subsea cables land on the east coast. Once cloud regions and network interconnection points are established in one city, new capacity tends to follow them, because customers want low latency to both.

The limiting factor is changing. Ten years ago it was land. Now it is transmission capacity and water (see below).


Major Data Centre Projects

Projects across the Sydney metro area, including those detailed on the Western Sydney page:

ProjectPrecinctDeveloperCapacityStageLast verified
NEXTDC S7Eastern Creek (west)NEXTDC612 MW (planning)Prepare EIS27 Sep 2026
Mamre Road CampusKemps Creek (west)AirTrunk (SYD4 "Summit", reported)1 GW (portal) / 1.2 GW (reported)Amended SSD27 Sep 2026
CDC Marsden ParkMarsden Park (north-west)CDC504 MW ICTUnder construction27 Sep 2026
NEXTDC S4Horsley Park (west)NEXTDC365 MWPlanning and development27 Sep 2026
Goodman SYD01Artarmon (north)Goodman61 MW IT / 90 MW utilityUnder construction27 Sep 2026
Macquarie IC3 Super WestMacquarie Park (north)Macquarie Data Centres47 MWOpening slated Sep 202627 Sep 2026
Global Switch Sydney East expansionUltimo (city fringe)Global Switch+47 MW (to ~90 MW)Application filed (DCD)27 Sep 2026

Existing Operators

Sydney's operating facilities cluster in four areas.

North: Macquarie Park, Artarmon, Lane Cove West

The northern corridor has established enterprise and cloud facilities with good fibre routes to the CBD and North Sydney.

OperatorFacilities
NEXTDCS1 Macquarie Park (16 MW), S2 Macquarie Park (30 MW), S3 Artarmon (80 MW), S6 Artarmon (13.5 MW, which NEXTDC calls its first AI factory data centre)
Macquarie Data CentresMacquarie Park campus, including IC3 Super West
AirTrunkSYD2, Lane Cove West
GoodmanSYD01 Artarmon (under construction)

City fringe and south: Ultimo, Alexandria, Mascot

These facilities are dense with network interconnection and serve customers who need low latency to the CBD and to carrier networks.

OperatorFacilities
Global SwitchSydney East (400 Harris Street, Ultimo) and Sydney West
EquinixSY1 (Mascot), SY5 (Alexandria) and other SY facilities

West and north-west

Most new hyperscale capacity: AirTrunk SYD1 and SYD3 (Huntingwood), NEXTDC S4 and S7, CDC Marsden Park and Eastern Creek, Microsoft Kemps Creek, and Equinix's SY9x xScale facility at Rosehill. Covered in detail on the Western Sydney page.

Hyperscale cloud

AWS, Microsoft, Google and Oracle all operate Sydney cloud regions, using a mix of self-built facilities and capacity leased from the operators above. AWS plans to invest A$20 billion in Australian data centre infrastructure from 2025 to 2029, including in Sydney (Amazon). Microsoft announced a A$25 billion Australian investment to the end of 2029 in April 2026 (Microsoft).

Operator directory: Data centre operators in Australia


Data Centre Construction

Sydney construction activity is shifting in two directions at once:

  • Large greenfield campuses in the west. Multi-building, multi-phase programmes lasting many years (Marsden Park, S7, Mamre Road).
  • High-density infill in the north and city fringe. Smaller buildings designed for AI densities on established sites with existing power: Goodman SYD01, IC3 Super West, and the Global Switch Ultimo expansion. The Ultimo proposal adds 47 MW with little new floor space.

In NSW, data centres with more than 15 MW of electrical capacity are State Significant Development, assessed by the state rather than local councils (Gadens).

More: Data centre construction in Australia


Power & Grid Infrastructure

Is Sydney running out of power for data centres?

In parts of the Sydney basin, transmission capacity for new large loads is close to fully allocated. Transgrid reports more than 10 GW of data centre connection enquiries within a 12 km radius of its Sydney West substation since late 2024. That is equivalent to the peak winter load for the whole of NSW. Transgrid says available capacity in the Sydney basin "may soon be fully utilised by new connections".

Policy responses in 2026:

DateChangeWhat it does
14 Aug 2026Transgrid Network Capacity Allocation PolicyFor loads of 30 MW or more, capacity is allocated only when a network connection agreement is signed. Conditional agreements require evidence of progress on permits, land, construction, equipment and financing
5 Aug 2026NSW Electricity Infrastructure Investment Amendment Bill 2026 introducedExtends REZ-style access scheme powers to large loads so data centres pay for the network infrastructure they need (Energy-Storage.news)
17 Aug 2026NSW Data Centre Policy FrameworkSix performance areas, including no net cost to consumers and funding additional water and energy supply (NSW Government)

Distribution in Sydney is split between Ausgrid (inner, north and east), Endeavour Energy (west and south-west) and Transgrid at transmission level.

Water

Sydney Water says data centres currently use less than 1% of Greater Sydney's water, about 3.5 billion litres a year. It estimates the sector could increase Greater Sydney's total water demand by up to 20 to 25% by 2035, as reported by w.media. Sydney Water says it prioritises recycled water for the sector and that residential customers will be no worse off (Sydney Water).

More: Data centre power in Australia


Connectivity

Sydney is Australia's main international connectivity point on the east coast, with trans-Pacific cables to the United States and routes to Asia via systems including INDIGO. That concentration is why interconnection-focused facilities (Equinix's SY campus, Global Switch Ultimo, NEXTDC's northern sites) are in the inner city, while large hyperscale campuses in the west connect back to them over diverse metro fibre.

For a new campus, diversity matters more than distance: at least two physically separate fibre routes into the site, ideally to different interconnection points.

More: Data centre fibre · Data centre networking


AI Infrastructure

Sydney's AI-specific projects include:

  • NEXTDC S7. A non-binding MoU with OpenAI (December 2025) for an AI campus and GPU supercluster, with the first phase targeted for the second half of 2027, subject to approvals.
  • NEXTDC S6, Artarmon. Described by NEXTDC as designed for AI factories.
  • Macquarie IC3 Super West. Built for high-density power and liquid cooling.
  • Firmus Project Southgate. The CDC partnership includes planned NSW deployments.

More: AI Data Centres in Australia


Data Centre Suppliers in Sydney

Sydney has the deepest data centre supply chain in Australia: head contractors, HV electrical contractors, mechanical services firms, commissioning agents and equipment distributors. Browse by category:

Electrical · Cooling · Construction · Engineering · Fire protection · Security · Facilities management


Latest Sydney Data Centre Developments

20 August 2026. Transgrid publishes its latest Sydney basin network capacity update. Source

17 August 2026. NSW Government releases the NSW Data Centre Policy Framework and Guidelines. Source

14 August 2026. Transgrid's Network Capacity Allocation Policy takes effect.

8 August 2026. CDC's KC1 (144 MW, Kemps Creek) reported at SEARs stage. Source


Frequently Asked Questions

How many data centres are in Sydney?

The NSW Government counts more than 60 facilities in NSW that are operating or under construction, most of them in Greater Sydney. DC Byte counts 162 operational data centres nationally.

Where are Sydney's data centres located?

Established facilities are in Macquarie Park, Artarmon, Lane Cove West, Ultimo, Alexandria and Mascot. Most new hyperscale capacity is in Western Sydney: Eastern Creek, Kemps Creek, Horsley Park, Huntingwood and Marsden Park.

How long does a Sydney data centre take to approve?

Under the August 2026 NSW framework, projects that meet the Government's performance measures receive a commitment to assessment within 75 days. Projects that do not meet the measures follow the standard SSD process, which has historically taken considerably longer.

Who supplies power to Sydney data centres?

Transgrid operates the transmission network. Ausgrid and Endeavour Energy distribute power, depending on location. Large campuses usually connect at high voltage through an on-site substation.


Supplying Sydney's Data Centre Market?

Sydney has the most projects, the most operators and the most competition among suppliers. AISB helps suppliers build visibility with the developers, operators and head contractors behind Sydney's pipeline.


Sources & Verification

  • DC Byte: Australian Data Centre Forecast Report, Apr 2026. Link
  • Venture Insights: 2026 Australia Data Centre Outlook. Link
  • Transgrid: Data centres and electricity capacity in NSW, Aug 2026. Link
  • NSW Government: Data Centre Policy Framework, 17 Aug 2026. Link
  • NEXTDC: Sydney data centres. Link
  • AirTrunk: Australian locations. Link
  • Equinix: Sydney data centres. Link
  • DCD: Global Switch Ultimo expansion. Link
  • w.media: Sydney Water data centre demand. Link

See something that needs updating? Submit a correction.

Trusted by ambitious businesses
Coolaroo client logo
MSP client logo
NSK client logo
ECI client logo
Just Junk client logo
Equalexes client logo
Property With Superannuation client logo
A Plus Cosmetic Clinic client logo
Baran de Bordeaux client logo
Joint's Up client logo
Pacific Fuel Solutions client logo
Shafer Design Limited client logo
Dr M Janjic client logo
Elisha Engineering client logo
Extreme Global client logo
GF Flow System client logo
Humphries client logo
Frontier Pools client logo
Katarzyna Mackenzie Plastic Surgeon client logo
Yeomans Survey Solutions client logo
Marina Specialists client logo
The Oral Care Company client logo
Operation Restore Hope client logo
Patara Life client logo
Dr Tristan de Chalain client logo
Mo Cullen Shirtsmith client logo