Data Centre Intelligence Hub

Australian Data Centre Tenders & Procurement Opportunities

This page tracks two things:

  1. Public tenders. Government approaches to market for data centre facilities, hosting and related infrastructure, published on AusTender, BuyICT and state procurement portals.
  2. Procurement signals. Public events on private projects that usually come before contracts are let, such as a planning approval, a construction start or a named head contractor.

This is not an official tender portal. We summarise and link to the original notice. Always read the buyer's documents and confirm dates and requirements with the buyer before you respond. Closing dates can change.

Most data centre construction work in Australia is procured privately. Developers appoint head contractors, and head contractors let subcontract packages without public advertisement. Watching project stages is therefore often more useful than watching tender portals.


Listings

Tender / opportunityBuyerCategoryLocationClosing dateStatus
Data Centre Panel refresh (data centre facilities, colocation, prefabricated data centres)Digital Transformation AgencyFacilities and hostingNational (via BuyICT)17 Oct 2025, 4pmClosed; evaluation scheduled to finish by March 2026

Listings are added when a public notice is verified.


Open Data Centre Tenders

No open public data centre tenders were verified at the date above. When a notice is published on AusTender, BuyICT or a state portal, it will appear here with a link to the original.


Upcoming Procurement

Private projects at stages that commonly lead to contract awards. This is a general pattern, not a statement that contracts are available on any of these projects.

ProjectStageWhat typically follows
NEXTDC M4, Port MelbourneApproved Jan 2026Head contractor, long-lead electrical and mechanical equipment
AirTrunk MEL2, MelbourneAnnounced Dec 2025; multi-phaseCivil, structural, HV electrical
NEXTDC S7, Eastern CreekPrepare EISPlanning-stage consultants now; design and procurement after approval
STACK SYD01, Erskine ParkMore information requiredPlanning-stage consultants
Goodman Project Atlas, Eastern CreekResponse to submissionsConsultants updating studies; procurement after determination
CDC Perth, MaddingtonConstructionFit-out, commissioning, operations
Western Downs Digital Park, QLDDA lodged Aug 2026Planning consultants; later civil and energy infrastructure

Recently Closed

OpportunityBuyerClosedNotes
Data Centre Panel refreshDigital Transformation Agency17 Oct 2025The DTA estimated average annual spend through the panel by non-corporate Commonwealth entities at about $100 million (techpartner.news)

Procurement Categories

CategoryTypical buyerTypical route
Data centre facilities and colocation (government)Commonwealth and state agenciesDTA Data Centre Panel via BuyICT; state panels
Planning and environmental consultancyDeveloperDirect engagement, often before any public notice
Design engineeringDeveloperDirect appointment or limited competition
Head contractorDeveloperInvited tender or negotiated, often with repeat builders
Trade packages (electrical, mechanical, fire, security)Head contractorSubcontract tenders to the builder's panel
Long-lead equipment (transformers, switchgear, generators, UPS, chillers)Developer or head contractorFramework agreements with manufacturers
CommissioningDeveloperDirect appointment
Facilities management, security, cleaningOperatorTender or framework
Grid connection worksNetwork business (e.g. Transgrid), funded by the developerNetwork business procurement

How Data Centre Procurement Works

Government

Commonwealth agencies buy data centre facilities through the DTA's whole-of-government Data Centre Panel, which runs on the BuyICT platform. Hosting of sensitive and classified government data also requires a provider certified under the Hosting Certification Framework. See Canberra data centres for more on certification.

Larger government-linked projects may have Australian Industry Participation (AIP) plans, which set out how Australian suppliers can take part. The Department of Industry, Science and Resources publishes AIP plan summaries, including one for Data Centre Facilities 2, whole-of-government panel arrangements.

State portals to watch: NSW (buy.nsw), Victoria (Buying for Victoria), Queensland (QTenders), Western Australia (Tenders WA) and the ACT (Tenders ACT).

Private developers

  1. Pre-planning. The developer engages planning, environmental and engineering consultants.
  2. Design. Engineering consultants develop the design; long-lead equipment is often ordered at this stage.
  3. Head contractor selection. Usually by invited tender or negotiation. Developers with ongoing programmes often reuse builders. For example, FDC's IC3 Super West contract was its seventh project with Macquarie Data Centres.
  4. Subcontract packages. The head contractor tenders trade packages to its pre-qualified subcontractors.
  5. Commissioning and handover. Commissioning agents and testing specialists.
  6. Operation. The operator procures maintenance, FM and security services.

What buyers usually look for

Data centre buyers typically ask for evidence of mission-critical experience, safety systems and records, quality assurance, capacity to resource large programmes, and relevant certifications and licences. Government facilities may also need security-cleared personnel.


Get Tender Alerts

A weekly email covering new public data centre tenders and procurement signals: planning approvals, construction starts and named contractors. Choose your categories and states.

Get Data Centre Opportunity Alerts We ask for your name, business email, company, supplier category and states. You can unsubscribe at any time.


Want Earlier Warning Than a Tender Notice?

By the time a data centre package reaches public tender, if it ever does, the buyer usually already knows which suppliers it wants to invite. AISB's Opportunity Radar tracks projects from planning onwards and flags signals relevant to your category. Tender Copilot helps you prepare stronger responses faster when an opportunity arrives.


Sources & Verification

  • Digital Transformation Agency: Request for tender for new Data Centre Facilities Panel. Link
  • techpartner.news: DTA to refresh the whole-of-government Data Centre Panel. Link
  • Department of Industry, Science and Resources: Data Centre Facilities 2 AIP. Link
  • DCNN: FDC and Macquarie Data Centres. Link

See something that needs updating? Submit a correction.

Trusted by ambitious businesses
Coolaroo client logo
MSP client logo
NSK client logo
ECI client logo
Just Junk client logo
Equalexes client logo
Property With Superannuation client logo
A Plus Cosmetic Clinic client logo
Baran de Bordeaux client logo
Joint's Up client logo
Pacific Fuel Solutions client logo
Shafer Design Limited client logo
Dr M Janjic client logo
Elisha Engineering client logo
Extreme Global client logo
GF Flow System client logo
Humphries client logo
Frontier Pools client logo
Katarzyna Mackenzie Plastic Surgeon client logo
Yeomans Survey Solutions client logo
Marina Specialists client logo
The Oral Care Company client logo
Operation Restore Hope client logo
Patara Life client logo
Dr Tristan de Chalain client logo
Mo Cullen Shirtsmith client logo