Battery Storage (BESS) for Australian Data Centres

Battery energy storage systems (BESS) are becoming part of how Australian data centres get and manage power. In April 2026, Amazon signed nine PPAs in NSW and Victoria, eight of them solar-plus-storage. Quinbrook's Supernode in northern Brisbane, first announced as a data centre campus, began commercial operation of a 260 MW / 619 MWh battery in February 2026. New state rules push in the same direction: Victoria's September 2026 action plan requires new data centres to bring their own renewable supply and storage.


The Role of BESS in Data Centres

Batteries at or near data centres can do several jobs:

RoleWhat it does
ResilienceSupplies critical load during grid events, alongside or partly replacing diesel runtime
Peak demand managementReduces the peak drawn from the grid, which can lower network charges and the firm capacity a site needs
Renewable firmingStores solar or wind output to match a data centre's constant load
Grid interactionProvides frequency and other system services to the market when not needed on site
Speed to powerReduces the firm grid capacity needed to start operating, which can help where connection capacity is limited
UPS integrationLarge batteries can take on UPS bridging functions in some designs

Key Infrastructure Requirements

  • Sizing: power (MW) and energy (MWh) matched to the use case. Backup needs power and duration; firming needs energy
  • Grid connection and protection: battery connections must meet network business requirements
  • Grid-forming inverters: increasingly specified so batteries can support system strength and stability. pv magazine reports this trend for Australian hyperscale sites
  • Fire safety and separation: lithium-ion battery fire engineering, spacing, and emergency response planning
  • Controls: energy management systems that coordinate battery, grid, generators and UPS
  • Market participation: registration and trading arrangements where batteries provide grid services

Australian Examples

ProjectDetailStatus
Quinbrook Supernode, northern BrisbaneStage 1: 260 MW / 619 MWh; Stages 2 and 3 take it to 780 MW / 3,074 MWh; next to South Pine substationStage 1 operating (Feb 2026)
Amazon PPAs (NSW, VIC)8 of 9 PPAs include co-located batteries, e.g. Muswellbrook Solar Farm (94.5 MW solar + 70 MW battery), Forest Glen (72 MW + 72 MW)Contracted Apr 2026
Energy North off-grid hyperscale proposal1 GW data centre with about 16 GWh of battery storage, referred under the EPBC Act (Energy-Storage.news)Environmental referral
Project Meridien, KimberleyWind, solar, batteries and gas for an AI campusEarly stage

Policy Drivers

  • AEMC (August 2026): recommendations include supporting co-location of generation and storage with large data centres, and requiring firming capacity contracts.
  • Victoria (September 2026): new data centres must bring their own renewable supply and storage.
  • Federal Expectations (March 2026): operators should support the energy transition without raising costs for others.

Sources: Energy-Storage.news, Premier of Victoria.


Australian BESS Suppliers

Directory listings for this category are being verified before they are published. Supply to data centre projects? Add your company to be considered.

TypeTypical scope
Battery system integratorsContainerised BESS, inverters, EMS
EPC contractorsCivil, electrical and grid connection
Energy developersCo-located solar/wind + storage offered through PPAs
Operations and tradingMarket registration, dispatch optimisation

Selecting a Supplier

  • Experience connecting large batteries to Australian networks (NEM or WEM)
  • Grid-forming capability where specified
  • A fire safety case and separation design acceptable to the fire engineer and authority
  • Performance guarantees on capacity, round-trip efficiency and degradation
  • Ability to integrate with the data centre's generators, UPS and controls

Current Project Demand

Demand is growing on three fronts: storage bundled into renewable PPAs for data centre buyers, on-site storage to meet new state requirements, and storage used for speed to power where grid connections are constrained. See data centre power for the connection constraints behind this.


Relevant Data Centre Projects

Brisbane and Queensland · Perth and WA · All projects


List Your Company


Grow Your Data Centre Pipeline

Data centre buyers are only beginning to write battery requirements into their projects. AISB helps BESS suppliers and energy developers reach data centre developers while those requirements are being set.


See something that needs updating? Submit a correction.

Trusted by ambitious businesses
Coolaroo client logo
MSP client logo
NSK client logo
ECI client logo
Just Junk client logo
Equalexes client logo
Property With Superannuation client logo
A Plus Cosmetic Clinic client logo
Baran de Bordeaux client logo
Joint's Up client logo
Pacific Fuel Solutions client logo
Shafer Design Limited client logo
Dr M Janjic client logo
Elisha Engineering client logo
Extreme Global client logo
GF Flow System client logo
Humphries client logo
Frontier Pools client logo
Katarzyna Mackenzie Plastic Surgeon client logo
Yeomans Survey Solutions client logo
Marina Specialists client logo
The Oral Care Company client logo
Operation Restore Hope client logo
Patara Life client logo
Dr Tristan de Chalain client logo
Mo Cullen Shirtsmith client logo